Montest | Vestas
947
portfolio_page-template-default,single,single-portfolio_page,postid-947,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-theme-ver-11.1,qode-theme-bridge,wpb-js-composer js-comp-ver-4.11.1,vc_responsive
 

Vestas

Category
Pavillons
About This Project

Piliers (18 mètres, 16 tonnes) 283 unds.

Poutres à section variable (40 mètres, 45 tonnes) 300 unds.

Poutres de dalles 1286 unds.

Dalle alvéolaire 884 unds.

Panneau de façade en béton 32000 m2

Durée 5 mois